The FPS operates a certification process for Functioning platforms along with the Principal Contractor is needed to signal the certification confirming the System has actually been properly designed and properly constructed in accordance Along with the design, and that it's going to be regularly inspected and preserved. It is normally https://maps.app.goo.gl/YojC2P1gNve8wSuB6