1

Penmann Ltd finalises specialist HVAC installation for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://hyperbookmarks.com/story20645065/penmann-ltd-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-liverpool-site-supporting-fsi-phase-1-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story